URL: http://www.iruvx.eu/e20/e58/e262/index_eng.html

IRUVX-PP – THE PREPARATORY PHASE OF EUROFEL

IRUVX-PP – the preparatory phase of EuroFEL About us Work Packages WP8  · 

WP8 - FEL Source

WP8-Wiki


Objectives

The basic research and development areas for individual FEL facilities have been addressed by the EUROFEL Design Study, ending at the end of 2007. Building on these successful developments and the complementary expertise of the partners, the present work package focuses on technical preparatory work that is of critical importance for the timely and costeffective construction of components which are mandatory for the stable operation of all new FEL sources. They include an optical synchronisation system with 10 femtosecond precision (WP8.1), diagnostics and feedback systems for high precision control and stabilization of the longitudinal electron bunch profile and its arrival time (WP8.2) and a joint approach to seeding with High Harmonic Generation (HHG) lasers.

Subtasks:

WP8.1 10 femtosecond timing and synchronization
Responsible: DESY

8.1.1 Finalization of 10 femtosecond synchronization system at FLASH and long term
reliability test
8.1.2 Component ageing and reliability studies
8.1.3 Small scale optical synchronization test at an ERL
8.1.4 Direct seeding of Ti:Sapphire amplifiers by the timing pulses
8.1.5 Optical synchronization for laser cross-correlation and pump-probe experiments at SLS

WP8.2 Feedback and associated diagnostics
Responsible: STFC

8.2.1 Compression control in the frequency domain
8.2.2 On-line bunch profiling in the time domain
8.2.3 Development of an 11 GHz X-band lineariser
8.2.4 Software development

WP8.3 HHG laser
Responsible: MAXLAB

Team:


Work package leader

L. Badano, Elettra

Work package leader deputy

P. Gessler, DESY


© 2012 Deutsches Elektronen-Synchrotron DESY